C Ride
On the C Ride we enjoy a more moderate workout than the A & B rides. We practice group riding skills & communication in a supportive controlled paceline. If you’re looking for a pace similar to the old “Peet's Ride”, or are somewhat new to group rides, consider the once-per-month Joy Ride.
Start: Saturdays 9:00am from Summit Bicycles at 392 California Ave in Palo Alto, rolling at 9:15am, a few minutes after the B Ride departs
Pace: Double paceline when conditions allow, jamming as hard as you like on the climbs, sticking together otherwise. On most C Ride routes riders can skip the climbs, if desired, by waiting for the group at regroup points
Regroups: We regroup at the top and bottom of hills and recover after every climb
Example route: https://www.strava.com/routes/2977827685383107158 (click here to see more)
The C Ride is subject to Alto Velo's Ride Rules and all participants must sign an annual waiver.
New riders welcome!
If you’re a new rider or haven’t done a group ride before, consider trying the LHR Ride or Joy Ride. There are many critical things that one needs to know about biking in general & about group biking in particular, some of them not so obvious. It's a good idea to learn these not-the-hard-way 😉.
Check out this blog post “How to avoid being that rider”: https://trainright.com/14-group-ride-etiquette-tips-avoid-guy-girl/
To improve your group riding skills, consider joining a skills clinic. Lorri Lown's road biking clinics have worked for many: https://savvybike.com/clinics-and-camps-new/
A simple bike fit might also make a huge difference to your comfort & safety on the bike. For instance, many riders don't feel comfortable riding “in the drops” of the handlebars. However, riding in the drops offers, by far, the most overall control & braking ease. Alto Velo sponsor Agile Physical Therapy offers bike fit assessments.
See below for details of the next ride as well as past rides.
Alto Velo C Ride April 25, 2026 – Not Egan?
Hi All,
By all accounts last week’s ride was a simple route, well led, and enjoyed by all. This week Jonathan is leading so expect the ride to be none of these things.
Between Egan being cancelled and me noping out due to weather yesterday, I haven’t ridden all week, so let’s do some Egan-esque climing, shall we? This route is complicated so please consider downloading it!
We will warm up with La Cresta and Mora on our way to the first real water stop at McClellan Park. Then we will tackle Regnart and Prospect out and backs before winding our way to downtown Saratoga for our second water stop. For our last evil trick we will climb 9 to RWG with a Toll Gate/Pierce detour and then a final water/bathrooms stop at the Canyon picnic area just before Mt Eden road. From there it’s a party paceline on Foothill to Shake Shack!
We didn’t hand them out last week so this week we’ll have some socks from Riduck at the start!
AV C Ride
Time: Saturday, gather at 9:00 am, rolling by 9:15am
Start: Summit Bicycles
Road Route: Saratoga Suffering
51 mi, 4800 ft
Regroups:
Top of La Cresta, top of Mora
McClellan (bathrooms, water)
Top of Regnart, Top of Prospect
Downtown Saratoga (water)
Stevens Canyon Road (water, bathrooms)
Ride Leader: Jonathan
________________________________________________
The AV C Ride is subject to Alto Velo's Ride Rules (read them!).
Non - Members:
Alto Velo welcomes non-members to join us on our rides. However, non-members must have a Waiver on file with the club.
The AV C Ride offers a more moderate workout than the other Alto Velo rides (although a workout it is). Group riding skills & communication in a supportive controlled peloton are emphasized. When not on designated climbs, we aim to keep the group together.
Alto Velo C Ride April 18, 2026 – Page Mill & Mt. Eden
Hi All,
It’s been a while since we’ve done Page Mill so that’s where we’re headed this Saturday!
We’ll roll out, climb Page Mill and regroup at the top before heading south on Skyline. Then we descend Hwy 9 and – because I know you all secretly love climbing – we’re turning left onto Pierce Rd.
From there, we’ll hang a left onto Teerlink Way and then do the “fun” side of Mt. Eden. Once we’re over the hill, make a left onto Stevens Canyon Rd. to regroup and refill bottles. To finish it off, we’ll cruise home on Foothill Expressway.
As a bonus, we’ll have some socks from Riduck at the start!
AV C Road Ride
Time: Saturday, gather at 9:00 am, rolling by 9:15am
Start: Summit Bicycles
Road Route: Happy April 18th Ride
4/18 / 41.8 mi / 4,180 ft « it was meant to be
Regroups:
Top of Page Mill
Stevens Canyon Road
*We will assess as we go for additional regroup points.
Ride Leader: Apoorva
________________________________________________
The AV C Ride is subject to Alto Velo's Ride Rules (read them!).
Non - Members:
Alto Velo welcomes non-members to join us on our rides. However, non-members must have a Waiver on file with the club.
The AV C Ride offers a more moderate workout than the other Alto Velo rides (although a workout it is). Group riding skills & communication in a supportive controlled peloton are emphasized. When not on designated climbs, we aim to keep the group together.
Alto Velo C Ride 4/11/26 -A southern & maybe clever Rain Route
Hello AV-C group
It looks disappointing due to the rain forecast. However I will be @ the start and we will see how it goes.
It looks like there may be rain from 9-12 maybe it will get better for an hour or two before turning back on.
The forecast looks bad all over so I’m hoping the southern district will be less wet. Bring your rain gear.
I have called out a relatively flat route aside the climb over the dam & around the rez. Followed by some twists & turns through Saratoga & Cupertino. Not too many I hope.
We will head right to Foothill EXP way then south. Passed the Dam, Saratoga side streets then on Saratoga Sunnyvale Rd.
A left on Daves where we start heading back north through some less familiar Saratoga side streets.
On to Cupertino roads we have done many times.
After our stop @ McClelan park its up Foothill to the finish.
AV C Road Ride
Time: Saturday, gather at 9:00 am, rolling by 9:15am
Start: Summit Bicycles
Road Route:
The Rain Route south, The Rez, Saratoga & Cupertino https://www.strava.com/routes/3477155361055433826
≈ 43.5 mi & ≈ 2,400 ft
Regroups:
Stevens Creek Canyon - water & bathrooms
Piano Park @ the bottom of 9 & Saratoga Ave - Quick regroup
Saratoga Sunnyvale Rd & Herriman (near Saratoga high) - quick regroup
McClelan park - water & bathrooms
Summit Bicycles - finish
Ride Leader: Eric
________________________________________________
The AV C Ride is subject to Alto Velo's Ride Rules (read them!).
Non - Members:
Alto Velo welcomes non-members to join us on our rides. However, non-members must have a Waiver on file with the club.
The AV C Ride offers a more moderate workout than the other Alto Velo rides (although a workout it is). Group riding skills & communication in a supportive controlled peloton are emphasized. When not on designated climbs, we aim to keep the group together.
Alto Velo C Ride - April 4th, 2026 - Coastal Classic supported by Bicycle Law
Hi All
I took a look and last year we did this same route on the same weekend. The weather looks to be warming again so it should be a great day for the ride. Let’s take a slightly longer ride and head over to the west side of the hills and do the Coastal Classic. Those of you that can stay to the end of the ride, Bicycle Law, will be sponsoring Coffee & Snacks at Manresa (T&C Palo Alto) following the ride.
Bicycle Law is one of our Supporting Sponsors. They are a law firm specializing in litigation on behalf of cyclists. If you are injured as a result of a hostile driver, hostile road design, or something else, Bicycle law may be able to help. Thanks to the work of the Bicycle Law team, both amateur and professional cyclists have received as much as six-figure settlements after crashes. Alto Velo is proud to partner with a firm that is not only helping individual cyclists, but also the greater cycling community by holding motorists accountable for their actions.
Additionally, our newest sponsor Riduck is going to be joining our group rides this Saturday April 4th. Riduck’s Founder and CEO, Sang Hyuk Park will be joined by Derek Laan and the Korean National Elite Road Cycling Champion Jae Bin Yun.
Riduck is an automated power data analysis program that provides easy to understand training analysis. The program is free to use and we encourage all club members to sign up. Users have the option to share Riduck data publicly on Strava or keep it private on the app. See the March 20th email for instructions on how to sign up for Riduck.
The riders will be happy to discuss the program and answer any questions you have about it during the ride and after during coffee.
AV C Ride
Time: Saturday, gather at 9:00 am, rolling by 9:15am
Start: Summit Bicycles
Route: Coastal Classic (Manresa)
Regroups
Alpine / Portola
Sky Londa
Apple Jack’s
Bike Hut
Old Woodside Store
Ride Leader:Ed
________________________________________________
The AV C Ride is subject to Alto Velo's Ride Rules (read them!).
Non - Members:
Alto Velo welcomes non-members to join us on our rides. However, non-members must have a Waiver on file with the club.
The AV C Ride offers a more moderate workout than the other Alto Velo rides (although a workout it is). Group riding skills & communication in a supportive controlled peloton are emphasized. When not on designated climbs, we aim to keep the group together.
Alto Velo C Ride March 28, 2026 - OLH-West Alpine-Page Mill-Arastradero-Shake Shack
Hi All,
We will first go to the hill, then we’ll go up the hill, then we’ll go down the hill, then we’ll go up the hill and then down the hill and then have some shakes. While going up the hill, down the hill or having shakes, we will keep it sensible, and keep the rubber side down.
AV C Ride
Time: Saturday, gather at 9:00 am, rolling by 9:15am
Start: Summit Bicycles
Route: OLH-84-WAlpine-PM-Arastradero-ShakeShack
71km, 1400m
Regroups:
Skylonda (water)
La Honda
Top of Page Mill
Ride Leader: Otto
________________________________________________
The AV C Ride is subject to Alto Velo's Ride Rules (read them!).
Non - Members:
Alto Velo welcomes non-members to join us on our rides. However, non-members must have a Waiver on file with the club.
The AV C Ride offers a more moderate workout than the other Alto Velo rides (although a workout it is). Group riding skills & communication in a supportive controlled peloton are emphasized. When not on designated climbs, we aim to keep the group together.
Alto Velo C Ride March 21, 2026 - Los Gatos to Cat’s Hill
Hi All,
** Please note this ride starts at the Summit Bicycle in Los Gatos
Our race team is competing in Cat’s Hill this Saturday and we will make our annual pilgrimage to the race to support them. I will be driving down and if you wish to carpool let me know. I can take 2 others.
We will start at Summit and ride some flatter miles through Saratoga so we can loosen up the legs, and then tackle Highway 9. The segment is 6.41 miles and just over 2k vertical feet. At Saratoga Gap we will turn left and head to Castle Rock State Park and get our water replenishment and bathroom break. We will then continue across Skyline going mostly downhill, across Highway 17 and eventually head down to Lexington Reservoir. We will end with a gravel section down the dam and along the creek and finish at the Purple Onion. Once we finish up our coffee / latte / ice team, I hope you will join me by heading over to the other side of Los Gatos and cheer on our team.
AV C Ride
Time: Saturday, gather at 9:00 am, rolling by 9:15am
Start: Summit Bicycles - Los Gatos
Route: Cat’s Hill
42 Miles, 4300ft
Regroups:
Castle Rock State Park
Summit Road / H17
Ride Leader: Ed and Eric
________________________________________________
The AV C Ride is subject to Alto Velo's Ride Rules (read them!).
Non - Members:
Alto Velo welcomes non-members to join us on our rides. However, non-members must have a Waiver on file with the club.
The AV C Ride offers a more moderate workout than the other Alto Velo rides (although a workout it is). Group riding skills & communication in a supportive controlled peloton are emphasized. When not on designated climbs, we aim to keep the group together.
Alto Velo C Ride March 14, 2026 - Strade Bianche
Hi All,
In honor of last weekend’s race, I have pulled together a route with some gravel sections, a few narrow gates / gaps to navigate and a chance to enjoy the spring like weather and view the flowers. Given enough time we could add on a 2 mile look with the most Poppy’s you have every seen in 1 place.
Saturday’s loop is bang on 45 miles. We will head out to LAH, and tackle our first bottleneck at mile 7.2. We will have to navigate around a chain link gate but the reward is new roads that are only seen maybe 1x on an Egan ride. Don’t worry - we are heading down the road; not up an Egan segment. We will then link back up with Moody and head up to Chaparral Way. This is a true gravel climb. Nothing technical as I have done it on my road bike many times and am not even thinking about bringing my gravel bike. We will then head down Altamont and turn right on Moody. We will then head up to our next gravel / dirt climb - Dirt Moody. Another well packed dirt climb easily done on your road bike. This climb will crest at Page Mill where we turn left and do the Foothill Park climb.
Down Page Mill, left on Arastedero and a left on a less traveled road just before Zott’s. This comes back out on Alpine where we will stay on the bike trail for about 100 yards and turn left up Los Trancos. We will NOT be climbing Los Trancos. We will take a single lane path from Los Trancos to Valley Oak. A left off Valley Oak back onto Alpine and down Willowbrook. We will turn right and then left onto Georgia Lane and up another dirt path where we will pass by the backyard of Ed’s childhood home. We skirt through PV and another gate on Possum Road. The final gravel section will be off Family Farm Road. It is once again a single lane trail but the reward is heading into a few roads you likely have never ridden before. The final sections of the ride are straight forward with Huddard and back to the start. After Huddard if we are so inclined I am glad to ride us through Woodside Glens to Native Plan Preserve. This park has the best California Poppies.
This is very much an adventure ride with a lot of twists and turns. I wanted to take us on an adventure and a change to see nature before the spring is gone. With this warm weather and lack of rain, it will go fast. There are definitely ways to avoid the gravel if you wish. Ping me and I will help. I hope you find this route entertaining and a break from the normal roads.
AV C Ride
Time: Saturday, gather at 9:00 am, rolling by 9:15am
Start: Summit Bicycles
Route: Strade Bianche
45 Miles, 3700ft
Regroups:
Chaparral / Altamont
Foothill Park
Arastedero / PM (quick)
Roberts Market (2x)
Ride Leader: Ed and Jeff
________________________________________________
The AV C Ride is subject to Alto Velo's Ride Rules (read them!).
Non - Members:
Alto Velo welcomes non-members to join us on our rides. However, non-members must have a Waiver on file with the club.
The AV C Ride offers a more moderate workout than the other Alto Velo rides (although a workout it is). Group riding skills & communication in a supportive controlled peloton are emphasized. When not on designated climbs, we aim to keep the group together.
AV- C Mar 7th, Moody + 2 Parks, w/end-of-ride treats - Sponsored by Bicycle Law
Hi All,
This route will include some climbs around Los Altos, Portola Valley, and Woodside. This week, the climbs are moderate and not as steep as last week’s, for those who survived. We will have two main regroups, along with a regroup at the top of Alpine. The first main regroup will be after the Foothills Park climb, and the second main regroup will be after the Huddart Park climb.
At the end of the ride, Bicycle Law is treating us to refreshments at Manresa Bread.
The weather is expected to be nice, maybe a bit warm, so please bring enough water.
See you on the ride.
Time: Saturday, gather at 9:00 am, rolling by 9:15 am
Start: Summit Bicycles
Route: Moody + 2 Parks
Regroups
Major regroups: Foothills Park after climb, and Woodside Store Park after Huddart climb
Short regroups:Top of Alpine
Water / restrooms
Foothills Park
Woodside Store Park (water, bathroom-maybe. Stop at Huddart Park if you are desperate)
Ride Leaders: Brandy and John
________________________________________________
The AV C Ride is subject to Alto Velo's Ride Rules (read them!).
Non - Members:
Alto Velo welcomes non-members to join us on our rides. However, non-members must have a Waiver on file with the club.
The AV C Ride offers a more moderate workout than the other Alto Velo rides (although a workout it is). Group riding skills & communication in a supportive controlled peloton are emphasized. When not on designated climbs, we aim to keep the group together.
AV-C 2/28/26 - Westridge, Christal Springs, Belmont, Hastings, Crestview & Palomar
Hello AV-C
Ed & I are feeling a little on the knackered side so we will need your help with keeping us together. This route has some twists & turns (what else would you expect from me?) Please download the route. I don’t want to threaten my wife’s dog again. hehehe.
We will head through Stanford, up Alpine for our first climb - Westridge. Up & over to Portola Rd. North on Portola & Canada, past 92, Skyline (not the bike path as there is lots of foot traffic on weekends) to Christale Springs Rd.
We will be riding roads the somewhat parallel Polhemas & bypass much of Crestview by Heading down Christal Springs, right on Polhemas, 1st left on Ascension Dr. (Hint Hint)
Next is Rainbow, Lakeshore, Bel Air, Laurie, Parrott, W Hillsdale, Ferwood & Right on Alameda De Las Plugs for about 0.5 mi.
Right on Cipriani, Continental, Lyall, lake, Carlmont, Right on Hastings,(the hardest climb of the day) Right on Club, Left on Crestview & Stop @ Cresview Park
From Crestview park down the hill taking a left on La Mess. This is where we start the Palomar section.
Right on Pebble, through the gate & on to Palomar all the way down to Edgwood.
Left on Cordilleras, Canyon, Farmhill, Fireside, Alameda De Las Plugs, through the Sharion Hight neighborhood, San Hill, Stanford & finish a Shake Shake.
Regroups
Westridge & Portola
Canada & 84 drive way past intersection - quick regroup
Canada & 92 - quick regroup
Skyline & Christal Springs Rd - bathrooms
Crestview Park - Water/Bathrooms
Shake Shake
AV C Road Ride
Time: Saturday, gather at 9:00 am, rolling by 9:15am
Start: Summit Bicycles
Road Route: https://www.strava.com/routes/3461181244557506186
≈ 43mi & ≈ 3800ft
Ride Leader: Eric & Ed
________________________________________________
The AV C Ride is subject to Alto Velo's Ride Rules (read them!).
Non - Members:
Alto Velo welcomes non-members to join us on our rides. However, non-members must have a Waiver on file with the club.
The AV C Ride offers a more moderate workout than the other Alto Velo rides (although a workout it is). Group riding skills & communication in a supportive controlled peloton are emphasized. When not on designated climbs, we aim to keep the group together.
Alto Velo C Ride Feb 21, 2026 - Figure 8
Hi All,
Dry(ish?) roads and partly clear skies await us tomorrow! With B ride starting in Los Gatos we might be a big group and I’m wary of road debris after the storm so I tried to plan the route accordingly.
We are doing the classic OLH/WOLH loop, with the usual stops at Portola and Skylonda x2. Then we will climb up skyline to kings and do Star Hill/Swett before descending Kings to our last water break at the old Woodside Store. Then it’s mountain home to Sand Hill and back to Cal Ave.
AV C Ride
Time: Saturday, gather at 9:00 am, rolling by 9:15am
Start: Summit Bicycles
Route: Figure 8, Star Hill
47 Miles, 4600ft
Regroups:
Alpine & Portola (mile 7)
Skylonda X2 (miles 15, 21 - bathrooms, water)
Top of Tunitas (mi 27), Top of Swett (mi 30)
Woodside Store (mi 35 - water)
Sharon Park Drive (mi 42)
Ride Leader: Jonathan
________________________________________________
The AV C Ride is subject to Alto Velo's Ride Rules (read them!).
Non - Members:
Alto Velo welcomes non-members to join us on our rides. However, non-members must have a Waiver on file with the club.
The AV C Ride offers a more moderate workout than the other Alto Velo rides (although a workout it is). Group riding skills & communication in a supportive controlled peloton are emphasized. When not on designated climbs, we aim to keep the group together.
Alto Velo C Ride Feb 14, 2026 - I have a crush on every hill
Hi All,
In Latin America, el dia de San Valentin celebrates love and friendship, so I’m allowed to say I have a bike crush on all of you. Speaking of crushing, let’s show the local hills some love and hope the weather holds up. We have some very steep ascents and some even steeper descents so let’s make sure we don’t turn a crush into a crash, okay?
Assuming it’s not actually really wet in which case I will audible to something boring, our route will take us to Portola Valley for a Westridge (+ mapache) loop before circling back to Portola/Alpine where our first two regroups will be. Then it’s Willowbrook to Alpine to Vista Verde which someone said is taller than the top of OLH but they look the same elevation to me on Strava… hmm…
After carefully and safely descending Los Trancos, we will next regroup at the Arastradero Preserve parking lot for bathrooms/water at about the halfway point. Then comes a fun little tour of the Los Altos Hills with La Cresta and Mora (quick stops after each) and Altamont where we will have our final regroup before rolling back into town together. Hope you all love it!
AV C Ride
Time: Saturday, gather at 9:00 am, rolling by 9:15am
Start: Summit Bicycles
Route: Egan is coming
47 Miles, 4850ft
Regroups:
Alpine & Portola (x2 - mile 8, mile 15)
Top of Vista Verde (mile 20)
Arastradero Parking Lot (mile 26 - bathrooms, water)
Top of La Cresta (mi 28 - quick)
Top of Mora Water Tower (mi 34)
Altamont/Black Mtn (mi 40)
Ride Leader: Jonathan
________________________________________________
The AV C Ride is subject to Alto Velo's Ride Rules (read them!).
Non - Members:
Alto Velo welcomes non-members to join us on our rides. However, non-members must have a Waiver on file with the club.
The AV C Ride offers a more moderate workout than the other Alto Velo rides (although a workout it is). Group riding skills & communication in a supportive controlled peloton are emphasized. When not on designated climbs, we aim to keep the group together.
Alto Velo C Ride Feb 7, 2026 - Villa Montalvo and Stevens Canyon presented by Bike Law
Hi All,
I am going to start sandbagging the earliest in history: the day before the ride. I am recovering from my accident 5 weeks ago. I am on my heavy gravel bike. My back and neck still hurt. I could go on but you get the idea. I will need all of your help this weekend to keep the ride together on the designated route.
With my handicaps (I am slowly improving), I have designed a route with less long climbs and just a couple new roads. We will head south to Saratoga via McClellan Park and will go for a short route up to Villa Montalvo. We will turn around and head back up H9 before Eden and Pierce and then back through LAH.
** This Saturday is the best because we have Miles hosting us at Manresa in T&C Palo Alto after the ride. Stay with us to the end and get free coffee, matcha lemonade and pastries.
AV C Ride
Time: Saturday, gather at 9:00 am, rolling by 9:15am
Start: Summit Bicycles
Route: Villa Montalvo - Stevens Canyon
46 Miles, 4850ft
Regroups:
McClellan Park (water, restrooms)
Saratoga (water)
Picnic Area Stevens Canyon (water, bathrooms)
Ride Leader: Ed (retired and injured)
________________________________________________
The AV C Ride is subject to Alto Velo's Ride Rules (read them!).
Non - Members:
Alto Velo welcomes non-members to join us on our rides. However, non-members must have a Waiver on file with the club.
The AV C Ride offers a more moderate workout than the other Alto Velo rides (although a workout it is). Group riding skills & communication in a supportive controlled peloton are emphasized. When not on designated climbs, we aim to keep the group together.
Alto Velo C Ride Jan 31 - W Alpine and Shakes
Hi All,
I am grumpy because I have been under the weather and not riding outside. Maybe we can fix that.
Current forecast for Saturday is cloudy with a very slight chance of precipitation, so dress appropriately! We will roll out via Sand Hill to warm up on the first climb of the day, OLH. After our first rest stop at SkyLonda, we will carefully descend down to La Honda for another quick regroup before we tackle the main climb of the day on W Alpine.
After another regroup at the top, we will descent Page Mill safely and stop partway down at Foothills Park for our last bathroom and water stop, with the option of heading up to the vista point for a photo or doing an optional lap of the park while we wait for stragglers. From that point on we will make an effort to stick together as we roll through Arastradero and Alpine to Sand Hill and Shake Shack for a well-earned post ride reward.
AV C Ride
Time: Saturday, gather at 9:00 am, rolling by 9:15am
Start: Summit Bicycles
Route: OLH, W Alpine, FHP, Shakes
46 Miles, 4850ft
Regroups:
SkyLonda (water, restrooms) mile 12
La Honda Store (quick) mile 18
Top of W Alpine/Page mile 27
Foothills Park (water, bathrooms) mile 34
Ride Leader: Jonathan
________________________________________________
The AV C Ride is subject to Alto Velo's Ride Rules (read them!).
Non - Members:
Alto Velo welcomes non-members to join us on our rides. However, non-members must have a Waiver on file with the club.
The AV C Ride offers a more moderate workout than the other Alto Velo rides (although a workout it is). Group riding skills & communication in a supportive controlled peloton are emphasized. When not on designated climbs, we aim to keep the group together.
AV- C Jan 24th, Kings Mt. WOLH, and West Ridge
Hi All,
This route has some of our classic climbs of Kings Mountain, W-OLH, and Westridge. On the way up Kings Mountain, we will do our typical route through Huddart Park. I called the park today and the ranger said they are still doing construction at our typical restroom stop, so we will have a very short stop at the Amphitheater restrooms, where there is also water. We will then continue up Kings Mountain and then onto Swett. The next stop will then be at Sky Londa for our major regroup. The route then takes us to W-OLH and then over to Westridge for our last climb of the day.
Time: Saturday, gather at 9:00 am, rolling by 9:15 am
Start: Summit Bicycles
Route: Kings Mt., Swett, W-OLH, Westridge
Regroups
Major regroups: Sky Londa after Skyline descent from Swett
Short regroups: Huddart park (amphitheater restrooms), top of Swett, Sky Londa after W-OLH, Alpine & Westridge
Water / restrooms
Huddart park (amphitheater restrooms), Sky Londa
Ride Leader: John
________________________________________________
The AV C Ride is subject to Alto Velo's Ride Rules (read them!).
Non - Members:
Alto Velo welcomes non-members to join us on our rides. However, non-members must have a Waiver on file with the club.
The AV C Ride offers a more moderate workout than the other Alto Velo rides (although a workout it is). Group riding skills & communication in a supportive controlled peloton are emphasized. When not on designated climbs, we aim to keep the group together.
AV- C Jan 17th, Emerald Hills, Crestview, and Woodridge
Hi All,
This week’s route takes us into Emerald Hills, where we’ll climb up the back way and then descend past the lake. From there, we’ll head to Palomar and climb up to Crestview, with a regroup at Crestview Park. After Crestview, we’ll continue past Crystal Springs Rd, climb Woodridge, and then return by Skyline.
This week’s route includes a few short, punchy climbs with grades up to 14%, so perfect for prepping those Egan climbing legs.
Time: Saturday, gather at 9:00 am, rolling by 9:15 am
Start: Summit Bicycles
Route: Emerald Hills, Crestview and Woodridge
Regroups
Major regroups: Crestview Park and the Pulgas Water Temple
Short regroups: at the top of the main climbs and at the start of Skyline
Water / restrooms
Available at Crestview Park and the Pulgas Water Temple.
Ride Leader: John
________________________________________________
The AV C Ride is subject to Alto Velo's Ride Rules (read them!).
Non - Members:
Alto Velo welcomes non-members to join us on our rides. However, non-members must have a Waiver on file with the club.
The AV C Ride offers a more moderate workout than the other Alto Velo rides (although a workout it is). Group riding skills & communication in a supportive controlled peloton are emphasized. When not on designated climbs, we aim to keep the group together.
AV-C 1/10/2026 - 3 parks, Rancho, Foothills & Huddart
Hello C ride
It will be cold but dry for our Saturday ride
As far as I can tell we have never done all 3 parks in one go so here is your chance!
We will head south on Foothill exp. to Ranch San Antonio then back north through Los Altos & Palo Alto hills to Foothills park & Huddart park.
On our way back it’s through the maze, Whiskey hill, Sandhill past the horse park & Stanford campus.
Time: Saturday, gather at 9:00 am, rolling by 9:15am
Start: Summit Bicycles
Road Route -https://www.strava.com/routes/3440542241473918976 (~49mi & ~4,000ft)
Regroups:
Water Tank @ Ranch San Antonio (not the bathrooms but stop if you must. We will be @ the water tank)
The Quarry for a quick regroup
Foothills Park - water/bathroom
Huddart Park - water/bathroom @ the volley ball courts
Final stop - The Farm
Ride Leader: Eric
________________________________________________
The AV C Ride is subject to Alto Velo's Ride Rules (read them!).
Non - Members:
Alto Velo welcomes non-members to join us on our rides. However, non-members must have a Waiver on file with the club.
The AV C Ride offers a more moderate workout than the other Alto Velo rides (although a workout it is). Group riding skills & communication in a supportive controlled peloton are emphasized. When not on designated climbs, we aim to keep the group together.
Alto Velo C Ride Jan 3, 2026 - Another Modified North Rain Route
Hi All,
Before I drop into the logistics, I want to wish everybody a happy New Year. May you go higher, farther and faster in 2026.
Over the last couple of days, I have gone to disappointed to optimistic back to disappointed. It looks like there may be rain at from 8-11 but then it will get better. I have hopes that if we stay on east side of the Redwood City hills we could avoid the rain and get in a ride. Additionally, rain is less likely in San Mateo than Saratoga so the north route seems to make more sense.
Tomorrow is also our Manresa stop sponsored by Bike Law. Another reason to hope for the ride to come together.
We will saunter through Stanford and head north on Alameda. We will then hit some hills that will take us to Crestview. At the far end of Crestview, we will scream down Ralston and head up Tartan Tail / Lakeview and Black Mountain. We will regroup just past the 280 Freeway underpass at the golf course. From there it is a straight shot back to Manresa with a quick adding of the Maze and 85 / Portola to get to Sand Hill.
If it is actively raining, don’t expect to find me at the start. Please wait until 9:15 and start the ride.
AV C Road Ride
Time: Saturday, gather at 9:00 am, rolling by 9:15am
Start: Summit Bicycles
Road Route:
Another Modified North Rain Route
Regroups:
Crestview
Ralston
Black Mountain / Skyline
Across from Shell Station
Ride Leader: Ed
________________________________________________
The AV C Ride is subject to Alto Velo's Ride Rules (read them!).
Non - Members:
Alto Velo welcomes non-members to join us on our rides. However, non-members must have a Waiver on file with the club.
The AV C Ride offers a more moderate workout than the other Alto Velo rides (although a workout it is). Group riding skills & communication in a supportive controlled peloton are emphasized. When not on designated climbs, we aim to keep the group together.
Alto Velo C Ride Dec 27, 2025 - Modified Peet’s Ride to Shake Shack
Hi All,
Sorry about the late notice but blame the weather. It was hard to tell what was going to happen. We look dry but cool. Dress warm.
Back when we used to have our rides leave from Los Altos, we had a new comers ride called the Peet’s ride. You guessed it. We used to leave from Peet’s in Los Altos. We will tackle 3 climbs (Westridge, Huddard and Jefferson) and end with a special holiday treat (Shakes at the Shack).
Happy Holidays everybody!
AV C Road Ride
Time: Saturday, gather at 9:00 am, rolling by 9:15am
Start: Summit Bicycles
Road Route:
Regroups:
Alpine / Portola
Tripp Road / Woodside Store
Jefferson / Canada
Ride Leader: Ed
________________________________________________
The AV C Ride is subject to Alto Velo's Ride Rules (read them!).
Non - Members:
Alto Velo welcomes non-members to join us on our rides. However, non-members must have a Waiver on file with the club.
The AV C Ride offers a more moderate workout than the other Alto Velo rides (although a workout it is). Group riding skills & communication in a supportive controlled peloton are emphasized. When not on designated climbs, we aim to keep the group together.
Alto Velo C Ride Dec19, 2025 - Rain Route A, B or C
Hi All,
“Forecast for Saturday is 20 - 39% chance of rain thru 2 pm. I was using Wunderground for this information. Based on this, I have proposed 3 routes from which we can choose. They are all listed below.” - This was the forecast route and rain from November 5. The last time it rained on the weekend. It has been cold but no rain. However, that looks to be changing. The weather forecast for tomorrow looks rather gloomy and so we will play it by ear.
If it is raining around 8:30 - 8:40 am in Palo Alto, I may not make it but please self organize. I hope to be there.
AV C Road Ride
Time: Saturday, gather at 9:00 am, rolling by 9:15am
Start: Summit Bicycles
Road Route:
Regroups:
TBD
Ride Leader: Ed
________________________________________________
The AV C Ride is subject to Alto Velo's Ride Rules (read them!).
Non - Members:
Alto Velo welcomes non-members to join us on our rides. However, non-members must have a Waiver on file with the club.
The AV C Ride offers a more moderate workout than the other Alto Velo rides (although a workout it is). Group riding skills & communication in a supportive controlled peloton are emphasized. When not on designated climbs, we aim to keep the group together.
AV- C Ride Dec 13 RWG and Saratoga to LG the Backway (gravel option)
Hi All,
This route is essentially a two-hill climb. We’ll head south to Redwood Gulch for the first ascent. After that, we’ll take on the climb between Saratoga and Los Gatos. There is a gravel option for this section, and I’ll lead the group through the gravel path. I completed it on 28 mm tires, and 25 mm should also be fine. Please note that there are two routes on the notice.
If gravel isn’t your preference, feel free to load the non-gravel route and meet the group back in Los Gatos. We’ll all regroup at the Los Gatos town center next to the water fountain.
There will be three water stops along the way. Depending on time and group preference, we may take an additional stop at McClellan Park.
AV C Ride
Time: Saturday, gather at 9:00 am, rolling by 9:15 am
Start: Summit Bicycles
Route Gravel Option: RWG and Saratoga to LG the Back Gravel way
Route Road Option: RWG and Saratoga to LG the Hill Road way
Regroups/stops
Stop 1: At the base of Mt. Eden in the park. (WC)
Stop 2: A new stop Saratoga Quarry Park. (WC)
Stop 3: In the central park area of Los Gatos on Main St.
Optional McClellan Park
Back to start and group may stop at The Farm
Ride Leader: John
________________________________________________
The AV C Ride is subject to Alto Velo's Ride Rules (read them!).
Non - Members:
Alto Velo welcomes non-members to join us on our rides. However, non-members must have a Waiver on file with the club.
The AV C Ride offers a more moderate workout than the other Alto Velo rides (although a workout it is). Group riding skills & communication in a supportive controlled peloton are emphasized. When not on designated climbs, we aim to keep the group together.