AV- C Mar 7th, Moody + 2 Parks, w/end-of-ride treats - Sponsored by Bicycle Law
Hi All,
This route will include some climbs around Los Altos, Portola Valley, and Woodside. This week, the climbs are moderate and not as steep as last week’s, for those who survived. We will have two main regroups, along with a regroup at the top of Alpine. The first main regroup will be after the Foothills Park climb, and the second main regroup will be after the Huddart Park climb.
At the end of the ride, Bicycle Law is treating us to refreshments at Manresa Bread.
The weather is expected to be nice, maybe a bit warm, so please bring enough water.
See you on the ride.
Time: Saturday, gather at 9:00 am, rolling by 9:15 am
Start: Summit Bicycles
Route: Moody + 2 Parks
Regroups
Major regroups: Foothills Park after climb, and Woodside Store Park after Huddart climb
Short regroups:Top of Alpine
Water / restrooms
Foothills Park
Woodside Store Park (water, bathroom-maybe. Stop at Huddart Park if you are desperate)
Ride Leaders: Brandy and John
________________________________________________
The AV C Ride is subject to Alto Velo's Ride Rules (read them!).
Non - Members:
Alto Velo welcomes non-members to join us on our rides. However, non-members must have a Waiver on file with the club.
The AV C Ride offers a more moderate workout than the other Alto Velo rides (although a workout it is). Group riding skills & communication in a supportive controlled peloton are emphasized. When not on designated climbs, we aim to keep the group together.