Alto Velo B/C Ride - July 12, 2025 - Post Pesky Ride

Hi All

7/12 - No Saturday AM ride, but rather a post-Pesky race ride from the high school. We will visit all the canyons that are typically too far to reach from Palo Alto via the C Ride.

7/19 - Coastal Classic with The Bike Hut Classic segment. Popsicles at the top Tunitas for AV members and a post ride pizza party sponsored by Bike Law.

We do the Coastal Classic in support of the Bike Hut Classic to help incentivize riders to sign up and do the event. Here is the link and please think about participating. https://www.bikehutclassic.org/


AV C Ride
Time:
Saturday, gather at 2:00 pm, rolling by 2:15 pm
Start: Pescadero High School 
Route: Pesky Post Race Ride (49 mi, 4700 ft)
Regroups

San Gregorio

Bike Hut

Half Moon Bay

Bike Hut

Ride Leader: Ed
________________________________________________

The AV C Ride is subject to Alto Velo's Ride Rules (read them!).

Non - Members:
Alto Velo welcomes non-members to join us on our rides. However, non-members must have a Waiver on file with the club.

The AV C Ride offers a more moderate workout than the other Alto Velo rides (although a workout it is). Group riding skills & communication in a supportive controlled peloton are emphasized. When not on designated climbs, we aim to keep the group together.

Next
Next

Alto Velo C Ride - July 5, 2025 - Coastal Classic