Alto Velo C Ride May 24/25

Starts at Summit Bicycles in Palo Alto

(Moody + 2 parks)
https://www.strava.com/routes/3360742249727184366

45 miles, 4050k' vertical

Welcome to the holiday weekend version of ‘2 Parks’: and old classic with some new twists including my all time favorite climb up Moody! With a bit of ‘here, there, and everywhere’ we will meander through Los Altos hills, tackle Moody, enjoy our favorite ‘loop with a view’ in foothills park, make our way to Woodside via a quick up and down on Alpine, and finally make our way to Huddart.

The AV C Ride is subject to Alto Velo's Ride Rules (read them!) and all participants must sign an annual waiver.

Non - Members: Alto Velo welcomes non-members to join us on our ride; however, non-members must have a Waiver on file with the club.

Time: Saturday gather at 9:00am, rolling by 9:15am

Start: Summit Bikes - 392 California Ave, Palo Alto, CA
Summit is Alto Velo's sponsoring bike shop.

Protocol:

  • Helmets required, no sudden lateral moves, call out hazards, call out mechanical problems, ride at a steady pace, …, ask for a mentor if you are new to group riding

  • Jam as hard as you like on the climbs, occasional sprint for fun, soft pedal for an in-flight regroup when we get separated

  • Regroup at the top of every major climb and every significant descent — everyone descends at their own safe speed

  • Pay attention to the regroup locations and don’t pass them if you wish to stay with the group

Bring two water bottles

Regroups: first regroup at Black and Altamont, we will call out other regroups as we ride, bathrooms available in Foothills and Huddart Parks

Shake Shack endpoint: we will end at Shake Shack for drinks and snacks!

Ride Leader: Brandy

Previous
Previous

Alto Velo C Ride - May 31, 2025 - Highway 9 / Skyline - Please Note Early Starting Time 8:30 am

Next
Next

Alto Velo C Ride May17’25